BASALT
SubstationColorado · HOLY CROSS ELECTRIC ASSN, INC
BASALT is an electric transmission substation in Colorado, operated by HOLY CROSS ELECTRIC ASSN, INC. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #68713 | 230 kV | PUBLIC SERVICE CO OF COLORADO | — | 51.0 mi |
| #68731 | 230 kV | PUBLIC SERVICE CO OF COLORADO | — | 25.1 mi |
| #68728 | 115 kV | PUBLIC SERVICE CO OF COLORADO | — | 17.7 mi |
| #68730 | 115 kV | PUBLIC SERVICE CO OF COLORADO | — | 11.3 mi |
| #68732 | 115 kV | PUBLIC SERVICE CO OF COLORADO | — | 11.0 mi |
| #78857 | 115 kV | HOLY CROSS ELECTRIC ASSN, INC | — | 0.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of BASALT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| COOLEY MESA | Substation-Adjacent | CO | Eagle County | 230 kV | 300 MW | 1.7 yrs | 63.6 |
| SHOSHONE | Substation-Adjacent | CO | Eagle County | 115 kV | 100 MW | 1.7 yrs | 59.9 |
| UNKNOWN209707 | Substation-Adjacent | CO | Eagle County | 115 kV | 100 MW | 1.7 yrs | 59.4 |
| WOLCOTT | Substation-Adjacent | CO | Eagle County | 230 kV | 300 MW | 1.7 yrs | 57.9 |
| Greenfield (WOLCOTT - COOLEY MESA) | Greenfield | CO | Eagle County | 230 kV | 300 MW | 1.7 yrs | 57.2 |
| Greenfield (MALTA - HOPKINS) | Greenfield | CO | Eagle County | 230 kV | 300 MW | 1.7 yrs | 55.6 |
| GIS | Substation-Adjacent | CO | Pitkin County | 115 kV | 100 MW | 1.7 yrs | 55.4 |
| HOPKINS | Substation-Adjacent | CO | Pitkin County | 230 kV | 300 MW | 1.7 yrs | 54.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.