WILMINGTON (STATION C) TAP
SubstationCalifornia
WILMINGTON (STATION C) TAP is an electric transmission substation in California. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #88676 | 138 kV | — | IN SERVICE | 1.2 mi |
| #88798 | 138 kV | — | IN SERVICE | 6.9 mi |
| #89802 | 138 kV | — | IN SERVICE | 4.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of WILMINGTON (STATION C) TAP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| VALLEY (CA) | Substation-Adjacent | CA | Los Angeles County | 230 kV | 300 MW | 5.7 yrs | 68.0 |
| STATION L (SCATTERGOOD) | Substation-Adjacent | CA | Los Angeles County | 230 kV | 300 MW | 5.7 yrs | 67.8 |
| AIRWAY | Substation-Adjacent | CA | Los Angeles County | 230 kV | 300 MW | 5.7 yrs | 67.2 |
| STATION E (TOLUCA) | Substation-Adjacent | CA | Los Angeles County | 500 kV | 1,000 MW | 5.7 yrs | 66.6 |
| HAYNES | Substation-Adjacent | CA | Orange County | 230 kV | 300 MW | 5.7 yrs | 66.0 |
| HUNTINGTON BEACH | Substation-Adjacent | CA | Orange County | 230 kV | 300 MW | 5.7 yrs | 65.7 |
| AES Alamitos LLC | Brownfield | CA | Orange | — | 940 MW | — | 65.5 |
| CHEVMAIN | Substation-Adjacent | CA | Los Angeles County | 230 kV | 300 MW | 5.7 yrs | 65.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.