TORTILLA

Substation

California · AZUSA LIGHT & POWER

Max voltage
115
kV

TORTILLA is an electric transmission substation in California, operated by AZUSA LIGHT & POWER. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorAZUSA LIGHT & POWER
Coordinates34.8632, -117.0309

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82317115 kVAZUSA LIGHT & POWERIN SERVICE11.3 mi
#82570115 kVAZUSA LIGHT & POWERIN SERVICE31.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TORTILLA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TORTILLA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
VICTORVILLESubstation-AdjacentCALos Angeles County500 kV1,000 MW5.8 yrs66.5
SEGS IXSubstation-AdjacentCASan Bernardino County220 kV100 MW5.8 yrs60.6
Greenfield (ADELANTO - MARKETPLACE)GreenfieldCASan Bernardino County500 kV1,000 MW5.8 yrs59.6
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldCASan Bernardino County500 kV1,000 MW5.7 yrs59.4
Greenfield (ADELANTO - MARKETPLACE)GreenfieldCASan Bernardino County500 kV1,000 MW5.8 yrs59.4
VICTORSubstation-AdjacentCALos Angeles County230 kV300 MW5.7 yrs59.1
Greenfield (ELDORADO - LUGO)GreenfieldCASan Bernardino County500 kV1,000 MW5.8 yrs59.0
Greenfield (ELDORADO - LUGO)GreenfieldCASan Bernardino County500 kV1,000 MW5.8 yrs58.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TORTILLA substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.