TELEGRAPH CANYON

Substation

California · SAN DIEGO GAS & ELECTRIC

Max voltage
138
kV

TELEGRAPH CANYON is an electric transmission substation in California, operated by SAN DIEGO GAS & ELECTRIC. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorSAN DIEGO GAS & ELECTRIC
Coordinates32.6378, -117.0162

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#89154138 kVSAN DIEGO GAS & ELECTRICIN SERVICE6.6 mi
#92513138 kVSAN DIEGO GAS & ELECTRICIN SERVICE2.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TELEGRAPH CANYON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TELEGRAPH CANYON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIGUELSubstation-AdjacentCASan Diego County500 kV1,000 MW5.7 yrs66.3
OLD TOWNSubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs64.0
SUNCRESTSubstation-AdjacentCASan Diego County500 kV1,000 MW5.7 yrs63.4
PENASQUITOSSubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs63.4
LOS COCHESSubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs62.0
OTAY MESASubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs60.7
SYCAMORE CANYONSubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs60.5
CHICARITASubstation-AdjacentCASan Diego County138 kV100 MW5.7 yrs59.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen