TAP203364

Substation

California · PACIFICORP

Max voltage
115
kV

TAP203364 is an electric transmission substation in California, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorPACIFICORP
Coordinates41.7335, -120.3750

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79140115 kVPACIFICORPIN SERVICE35.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203364, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203364 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HILLTOPSubstation-AdjacentCAModoc County345 kV600 MW5.8 yrs58.8
Greenfield (FORT SAGE - HILLTOP)GreenfieldCAModoc County345 kV600 MW5.8 yrs53.9
Greenfield (FORT SAGE - HILLTOP)GreenfieldCAModoc County345 kV600 MW5.8 yrs53.5
WARNERSubstation-AdjacentCAModoc County230 kV300 MW5.7 yrs53.0
CEDARVILLE JUNCTIONSubstation-AdjacentCAModoc County115 kV100 MW5.7 yrs50.1
TAP203364Substation-AdjacentCAModoc County115 kV100 MW5.7 yrs49.0
Greenfield (CELILO - SYLMAR EAST)GreenfieldCAModoc County1000 kV1,000 MW5.8 yrs48.5
HILLTOP TAPSubstation-AdjacentCAModoc County230 kV300 MW5.7 yrs46.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203364 substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.