SUNCREST

Substation

California · SAN DIEGO GAS & ELECTRIC

Max voltage
500
kV

SUNCREST is an electric transmission substation in California, operated by SAN DIEGO GAS & ELECTRIC. It is classified as extra-high-voltage (500 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines4

Ownership & operation

OperatorSAN DIEGO GAS & ELECTRIC
Coordinates32.8084, -116.6833

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81559500 kVSAN DIEGO GAS & ELECTRICIN SERVICE89.2 mi
#81547230 kVSAN DIEGO GAS & ELECTRICIN SERVICE27.3 mi
#83814230 kVSAN DIEGO GAS & ELECTRICIN SERVICE25.8 mi
#92428230 kVSAN DIEGO GAS & ELECTRICIN SERVICE27.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SUNCREST, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SUNCREST substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIGUELSubstation-AdjacentCASan Diego County500 kV1,000 MW5.7 yrs66.3
SUNCRESTSubstation-AdjacentCASan Diego County500 kV1,000 MW5.7 yrs63.4
LOS COCHESSubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs62.0
OTAY MESASubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs60.7
SYCAMORE CANYONSubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs60.5
SANTEESubstation-AdjacentCASan Diego County138 kV100 MW5.7 yrs58.1
Greenfield (EAST COUNTY - MIGUEL)GreenfieldCASan Diego County500 kV1,000 MW5.7 yrs57.9
PROCTOR VALLEYSubstation-AdjacentCASan Diego County138 kV100 MW5.7 yrs57.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SUNCREST substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.