ROUND MOUNTAIN

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
500
kV

ROUND MOUNTAIN is an electric transmission substation in California, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as extra-high-voltage (500 kv) and connects 10 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines10

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
Coordinates40.8080, -121.9356

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#86996500 kVIN SERVICE94.6 mi
#88894500 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE89.4 mi
#91445500 kVIN SERVICE94.6 mi
#85459500 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE89.4 mi
#88661230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE33.9 mi
#84132230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE1.2 mi
#92641230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE33.5 mi
#85776230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE8.1 mi
#86804230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE12.6 mi
#87632230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE33.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ROUND MOUNTAIN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ROUND MOUNTAIN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROUND MOUNTAINSubstation-AdjacentCAShasta County500 kV1,000 MW5.7 yrs61.4
AIRPORTSubstation-AdjacentCAShasta County230 kV300 MW5.7 yrs55.3
Greenfield (TABLE MT. - ROUND MOUNTAIN)GreenfieldCAShasta County500 kV1,000 MW5.7 yrs55.1
Greenfield (TABLE MT. - ROUND MOUNTAIN)GreenfieldCAShasta County500 kV1,000 MW5.7 yrs54.2
Greenfield (TABLE MT. - ROUND MOUNTAIN)GreenfieldCAShasta County500 kV1,000 MW5.7 yrs53.9
Greenfield (TABLE MT. - ROUND MOUNTAIN)GreenfieldCAShasta County500 kV1,000 MW5.7 yrs53.7
PANORAMASubstation-AdjacentCATehama County115 kV100 MW5.7 yrs53.5
PIT 7 TAPSubstation-AdjacentCAShasta County230 kV300 MW5.7 yrs53.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ROUND MOUNTAIN substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.