ROSSMOOR TAP 2

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
230
kV

ROSSMOOR TAP 2 is an electric transmission substation in California, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
Coordinates37.8559, -122.0760

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82514230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE0.7 mi
#83695230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE5.3 mi
#86164230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE19.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ROSSMOOR TAP 2, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ROSSMOOR TAP 2 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MARTINSubstation-AdjacentCASan Mateo County230 kV300 MW5.7 yrs63.4
LAS POSITASSubstation-AdjacentCAAlameda County230 kV300 MW5.7 yrs62.8
ROSSMOORSubstation-AdjacentCAContra Costa County230 kV300 MW5.7 yrs62.7
EMBARCADEROSubstation-AdjacentCAContra Costa County230 kV300 MW5.7 yrs62.4
CASTRO VALLEYSubstation-AdjacentCAAlameda County230 kV300 MW5.7 yrs62.4
VINEYARDSubstation-AdjacentCAAlameda County230 kV300 MW5.7 yrs62.2
POTREROSubstation-AdjacentCASan Mateo County230 kV300 MW5.7 yrs62.1
San Francisco Electric Reliability ProjBrownfieldCAContra Costa152 MW61.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ROSSMOOR TAP 2 substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.