ROCK CREEK

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
230
kV

ROCK CREEK is an electric transmission substation in California, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
Coordinates39.9054, -121.3456

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84190230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE16.5 mi
#85754230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE6.5 mi
#87576230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE10.6 mi
#91355230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE7.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ROCK CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ROCK CREEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP302668Substation-AdjacentCAPlumas County230 kV300 MW5.7 yrs58.2
BUCKS CREEKSubstation-AdjacentCAPlumas County230 kV300 MW5.7 yrs57.5
TABLE MT.Substation-AdjacentCAButte County500 kV1,000 MW5.7 yrs56.4
ROCK CREEKSubstation-AdjacentCAButte County230 kV300 MW5.7 yrs56.4
HYATTSubstation-AdjacentCAButte County230 kV300 MW5.7 yrs55.6
Greenfield (TABLE MT. - ROUND MOUNTAIN)GreenfieldCAButte County500 kV1,000 MW5.7 yrs54.0
BELDENSubstation-AdjacentCAPlumas County230 kV300 MW5.7 yrs53.7
CARIBOUSubstation-AdjacentCAPlumas County230 kV300 MW5.7 yrs53.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ROCK CREEK substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.