REINWAY

Substation

California · MODESTO IRRIGATION DISTRICT

Max voltage
110
kV

REINWAY is an electric transmission substation in California, operated by MODESTO IRRIGATION DISTRICT. It is classified as distribution (69–115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage110 kV
Min voltage110 kV
Voltage classDistribution (69–115 kV)
Connected lines1

Ownership & operation

OperatorMODESTO IRRIGATION DISTRICT
Coordinates37.6467, -120.7735

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84536110 kVMODESTO IRRIGATION DISTRICTIN SERVICE9.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of REINWAY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near REINWAY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROSEMORE BSubstation-AdjacentCAStanislaus County230 kV300 MW5.7 yrs62.6
WARNERVILLESubstation-AdjacentCAStanislaus County230 kV300 MW5.7 yrs61.4
PARKERSubstation-AdjacentCAStanislaus County230 kV300 MW5.7 yrs60.2
WILSONSubstation-AdjacentCAMerced County230 kV300 MW5.8 yrs58.2
STANDIFORDSubstation-AdjacentCAStanislaus County115 kV100 MW5.7 yrs58.2
OLINDASubstation-AdjacentCACalaveras County500 kV1,000 MW5.7 yrs57.8
SANTA CRUZSubstation-AdjacentCAStanislaus County110 kV50 MW5.7 yrs57.8
HERSHEYSubstation-AdjacentCAStanislaus County115 kV100 MW5.7 yrs57.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for REINWAY substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.