PIT 6

Substation

California

Max voltage
230
kV

PIT 6 is an electric transmission substation in California. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates40.9223, -121.9924

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#90596230 kVIN SERVICE3.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PIT 6, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PIT 6 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROUND MOUNTAINSubstation-AdjacentCAShasta County500 kV1,000 MW5.7 yrs61.4
SULPHURSubstation-AdjacentCAShasta County230 kV300 MW5.7 yrs56.2
CHURNSubstation-AdjacentCAShasta County230 kV300 MW5.7 yrs55.8
Greenfield (TABLE MT. - ROUND MOUNTAIN)GreenfieldCAShasta County500 kV1,000 MW5.7 yrs55.1
Greenfield (TABLE MT. - ROUND MOUNTAIN)GreenfieldCAShasta County500 kV1,000 MW5.7 yrs53.9
Greenfield (MALIN - ROUND MOUNTAIN)GreenfieldCAShasta County500 kV1,000 MW5.7 yrs53.4
PIT 7 TAPSubstation-AdjacentCAShasta County230 kV300 MW5.7 yrs53.3
PIT 7Substation-AdjacentCAShasta County230 kV300 MW5.7 yrs52.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PIT 6 substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.