PARKER is an electric transmission substation in California, operated by MODESTO IRRIGATION DISTRICT. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage110 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorMODESTO IRRIGATION DISTRICT
Coordinates37.6683, -120.9173

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#86665230 kVIN SERVICE24.8 mi
#87019230 kVIN SERVICE14.8 mi
#84536110 kVMODESTO IRRIGATION DISTRICTIN SERVICE9.5 mi
#90331110 kVMODESTO IRRIGATION DISTRICTIN SERVICE0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PARKER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PARKER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WEBERSubstation-AdjacentCASan Joaquin County230 kV300 MW5.7 yrs63.2
ROSEMORE BSubstation-AdjacentCAStanislaus County230 kV300 MW5.7 yrs62.6
WARNERVILLESubstation-AdjacentCAStanislaus County230 kV300 MW5.7 yrs61.4
PARKERSubstation-AdjacentCAStanislaus County230 kV300 MW5.7 yrs60.2
WESTLEYSubstation-AdjacentCAStanislaus County230 kV300 MW5.7 yrs59.7
UNKNOWN308925Substation-AdjacentCASan Joaquin County115 kV100 MW5.7 yrs59.5
STANDIFORDSubstation-AdjacentCAStanislaus County115 kV100 MW5.7 yrs58.2
FRENCH CAMPSubstation-AdjacentCASan Joaquin County115 kV100 MW5.7 yrs57.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PARKER substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.