MIDDLE FORK

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
230
kV

MIDDLE FORK is an electric transmission substation in California, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
Coordinates39.0246, -120.5966

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84629230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE8.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MIDDLE FORK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MIDDLE FORK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JONES FORKSubstation-AdjacentCAEl Dorado County230 kV300 MW5.7 yrs54.6
RALSTONSubstation-AdjacentCAPlacer County230 kV300 MW5.7 yrs54.2
UNION VALLEYSubstation-AdjacentCAEl Dorado County230 kV300 MW5.7 yrs54.1
ROBBS PEAKSubstation-AdjacentCAEl Dorado County230 kV300 MW5.7 yrs53.6
UNKNOWN307690Substation-AdjacentCAEl Dorado County115 kV100 MW5.7 yrs53.6
Greenfield (WHITE ROCK - CANYONLANDS)GreenfieldCAEl Dorado County230 kV300 MW5.7 yrs53.1
PLACERVILLESubstation-AdjacentCAEl Dorado County115 kV100 MW5.7 yrs53.0
Greenfield (RALSTON - GOLD HILL)GreenfieldCAPlacer County230 kV300 MW5.7 yrs53.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MIDDLE FORK substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.