MARTIN

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
230
kV

MARTIN is an electric transmission substation in California, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as high-voltage (230 kv) and connects 14 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines14

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
Coordinates37.7037, -122.4095

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82464230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE6.9 mi
#87371230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE7.0 mi
#87742230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE25.2 mi
#88615230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE11.8 mi
#91391230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE13.3 mi
#92736115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE3.3 mi
#92089115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE3.0 mi
#92220115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE3.0 mi
#91027115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE3.0 mi
#91348115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE4.0 mi
#82978115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE4.0 mi
#85926115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE3.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MARTIN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MARTIN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MARTINSubstation-AdjacentCASan Mateo County230 kV300 MW5.7 yrs63.4
ROSSMOORSubstation-AdjacentCAContra Costa County230 kV300 MW5.7 yrs62.7
CASTRO VALLEYSubstation-AdjacentCAAlameda County230 kV300 MW5.7 yrs62.4
EMBARCADEROSubstation-AdjacentCAContra Costa County230 kV300 MW5.7 yrs62.4
POTREROSubstation-AdjacentCASan Mateo County230 kV300 MW5.7 yrs62.1
S.L.A.C.Substation-AdjacentCASan Mateo County230 kV300 MW5.7 yrs62.0
San Francisco Electric Reliability ProjBrownfieldCAContra Costa152 MW61.9
CASTRO VALLEY TAPSubstation-AdjacentCAAlameda County230 kV300 MW5.7 yrs61.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.