JONES FORK

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
230
kV

JONES FORK is an electric transmission substation in California, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
Coordinates38.8504, -120.3819

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#87960230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE3.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JONES FORK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JONES FORK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MEYERSSubstation-AdjacentCAAlpine County120 kV100 MW5.8 yrs55.6
JONES FORKSubstation-AdjacentCAEl Dorado County230 kV300 MW5.7 yrs54.6
RALSTONSubstation-AdjacentCAPlacer County230 kV300 MW5.7 yrs54.2
UNION VALLEYSubstation-AdjacentCAEl Dorado County230 kV300 MW5.7 yrs54.1
ROBBS PEAKSubstation-AdjacentCAEl Dorado County230 kV300 MW5.7 yrs53.6
JAYBIRDSubstation-AdjacentCAEl Dorado County230 kV300 MW5.7 yrs52.3
LOON LAKESubstation-AdjacentCAEl Dorado County230 kV300 MW5.7 yrs51.5
SALT SPRINGSSubstation-AdjacentCAAmador County115 kV100 MW5.7 yrs49.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JONES FORK substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.