GATES
SubstationCalifornia · PACIFIC GAS & ELECTRIC COMPANY
GATES is an electric transmission substation in California, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as extra-high-voltage (500 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #82492 | 500 kV | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 79.2 mi |
| #91696 | 500 kV | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 81.0 mi |
| #92112 | 500 kV | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 83.3 mi |
| #86945 | 230 kV | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 43.5 mi |
| #88981 | 230 kV | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 68.5 mi |
| #84076 | 230 kV | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 43.5 mi |
| #85706 | 230 kV | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 69.1 mi |
| #87000 | 115 kV | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 4.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of GATES, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| GATES | Substation-Adjacent | CA | Kings County | 500 kV | 1,000 MW | 5.7 yrs | 61.8 |
| CARUTHERS | Substation-Adjacent | CA | Fresno County | 230 kV | 300 MW | 5.8 yrs | 60.2 |
| Greenfield (MIDWAY - LOS BANOS) | Greenfield | CA | Kings County | 500 kV | 1,000 MW | 5.8 yrs | 59.3 |
| UNKNOWN307522 | Substation-Adjacent | CA | Fresno County | 230 kV | 300 MW | 5.8 yrs | 59.1 |
| ARCO | Substation-Adjacent | CA | Kings County | 230 kV | 300 MW | 5.8 yrs | 58.7 |
| Greenfield (MIDWAY - GATES) | Greenfield | CA | Kings County | 500 kV | 1,000 MW | 5.8 yrs | 58.3 |
| Greenfield (MIDWAY - LOS BANOS) | Greenfield | CA | Kings County | 500 kV | 1,000 MW | 5.8 yrs | 57.3 |
| Greenfield (MIDWAY - LOS BANOS) | Greenfield | CA | San Benito County | 500 kV | 1,000 MW | 5.8 yrs | 56.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for GATES substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.