EL CASCO

Substation

California · AZUSA LIGHT & POWER

Max voltage
230
kV

EL CASCO is an electric transmission substation in California, operated by AZUSA LIGHT & POWER. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorAZUSA LIGHT & POWER
Coordinates33.9664, -117.0775

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81270230 kVIN SERVICE30.1 mi
#85932230 kVAZUSA LIGHT & POWERIN SERVICE13.9 mi
#90893115 kVAZUSA LIGHT & POWERIN SERVICE6.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EL CASCO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EL CASCO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
VALLEYSubstation-AdjacentCAOrange County500 kV1,000 MW5.7 yrs65.7
INLAND EMPIRESubstation-AdjacentCAOrange County500 kV1,000 MW5.7 yrs64.9
SAN BERNARDINOSubstation-AdjacentCAOrange County230 kV300 MW5.7 yrs61.6
Greenfield (DEVERS - VALLEY)GreenfieldCAOrange County500 kV1,000 MW5.7 yrs58.9
Greenfield (SERRANO - VALLEY)GreenfieldCAOrange County500 kV1,000 MW5.7 yrs58.7
Greenfield (ELDORADO - LUGO)GreenfieldCAOrange County500 kV1,000 MW5.8 yrs58.7
VISTASubstation-AdjacentCAOrange County230 kV300 MW5.7 yrs58.6
Diamond Valley LakeBrownfieldCAOrange10 MW58.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EL CASCO substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.