CORDELIA

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
115
kV

CORDELIA is an electric transmission substation in California, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines5

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
Coordinates38.2159, -122.1124

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79645115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE12.6 mi
#80648115 kVPACIFIC GAS & ELECTRIC COMPANY2.0 mi
#82650115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE1.7 mi
#86375115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE11.6 mi
#87254115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE8.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CORDELIA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CORDELIA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROSSMOORSubstation-AdjacentCAContra Costa County230 kV300 MW5.7 yrs62.7
TIDEWATERSubstation-AdjacentCAContra Costa County230 kV300 MW5.7 yrs61.4
VACA-DIXONSubstation-AdjacentCASolano County500 kV1,000 MW5.7 yrs61.2
BAHIASubstation-AdjacentCAContra Costa County230 kV300 MW5.7 yrs60.4
LONE TREESubstation-AdjacentCAContra Costa County230 kV300 MW5.7 yrs60.3
PARKWAYSubstation-AdjacentCASolano County230 kV300 MW5.7 yrs60.1
PEABODYSubstation-AdjacentCASolano County230 kV300 MW5.7 yrs59.1
LAMBIESubstation-AdjacentCASolano County230 kV300 MW5.7 yrs59.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen