COPCO 2 230KV
SubstationCalifornia · PACIFICORP
COPCO 2 230KV is an electric transmission substation in California, operated by PACIFICORP. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #67335 | 230 kV | PACIFICORP | — | 19.9 mi |
| #67336 | 230 kV | PACIFICORP | IN SERVICE | 38.7 mi |
| #67760 | 115 kV | PACIFICORP | — | 18.5 mi |
| #67762 | 115 kV | PACIFICORP | — | 10.4 mi |
| #67763 | 115 kV | PACIFICORP | — | 0.2 mi |
| #67769 | 115 kV | PACIFICORP | — | 14.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of COPCO 2 230KV, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Greenfield (KLAMATH CO-GEN - MERIDIAN) | Greenfield | OR | Jackson County | 500 kV | 1,000 MW | 1.7 yrs | 67.1 |
| MOUNTAIN AVENUE | Substation-Adjacent | OR | Jackson County | 115 kV | 100 MW | 1.7 yrs | 65.1 |
| Greenfield (KLAMATH CO-GEN - MERIDIAN) | Greenfield | OR | Jackson County | 500 kV | 1,000 MW | 1.7 yrs | 64.6 |
| ASHLAND | Substation-Adjacent | OR | Jackson County | 115 kV | 100 MW | 1.7 yrs | 64.2 |
| JOHN C BOYLE | Substation-Adjacent | OR | Jackson County | 230 kV | 300 MW | 1.7 yrs | 64.0 |
| TAP203631 | Substation-Adjacent | OR | Jackson County | 115 kV | 100 MW | 1.7 yrs | 63.3 |
| Greenfield (KLAMATH CO-GEN - MERIDIAN) | Greenfield | OR | Jackson County | 500 kV | 1,000 MW | 1.7 yrs | 63.1 |
| OAK KNOLL | Substation-Adjacent | OR | Jackson County | 115 kV | 100 MW | 1.7 yrs | 62.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for COPCO 2 230KV substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.