COPCO 2 115KV is an electric transmission substation in California, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorPACIFICORP
Coordinates41.9749, -122.3587

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67763115 kVPACIFICORP0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of COPCO 2 115KV, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near COPCO 2 115KV substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (KLAMATH CO-GEN - MERIDIAN)GreenfieldORJackson County500 kV1,000 MW1.7 yrs67.1
MOUNTAIN AVENUESubstation-AdjacentORJackson County115 kV100 MW1.7 yrs65.1
Greenfield (KLAMATH CO-GEN - MERIDIAN)GreenfieldORJackson County500 kV1,000 MW1.7 yrs64.6
ASHLANDSubstation-AdjacentORJackson County115 kV100 MW1.7 yrs64.2
JOHN C BOYLESubstation-AdjacentORJackson County230 kV300 MW1.7 yrs64.0
TAP203631Substation-AdjacentORJackson County115 kV100 MW1.7 yrs63.3
Greenfield (KLAMATH CO-GEN - MERIDIAN)GreenfieldORJackson County500 kV1,000 MW1.7 yrs63.1
OAK KNOLLSubstation-AdjacentORJackson County115 kV100 MW1.7 yrs62.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for COPCO 2 115KV substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.