CAVITT

Substation

California · SACRAMENTO MUNICIPAL UTILITY DISTRICT

Max voltage
115
kV

CAVITT is an electric transmission substation in California, operated by SACRAMENTO MUNICIPAL UTILITY DISTRICT. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorSACRAMENTO MUNICIPAL UTILITY DISTRICT
Coordinates38.6522, -121.1182

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85958115 kVSACRAMENTO MUNICIPAL UTILITY DISTRICTIN SERVICE1.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CAVITT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CAVITT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
STATION ASubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs64.4
STATION BSubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs64.3
STATION DSubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs63.2
FIDDYMENTSubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs63.2
FOOTHILLSubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs63.2
UNKNOWN302253Substation-AdjacentCASacramento County230 kV300 MW5.7 yrs63.1
NORTH CITYSubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs63.1
WESTPLANSubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs62.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CAVITT substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.