CABRILLO
SubstationCalifornia · CITY OF LOMPOC ELECTRIC DIVISION
CABRILLO is an electric transmission substation in California, operated by CITY OF LOMPOC ELECTRIC DIVISION. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #87359 | 115 kV | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 14.6 mi |
| #89044 | 115 kV | CITY OF LOMPOC ELECTRIC DIVISION | IN SERVICE | 1.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of CABRILLO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CABRILLO | Substation-Adjacent | CA | Santa Barbara County | 115 kV | 100 MW | 5.7 yrs | 55.3 |
| FAIRWAY TAP | Substation-Adjacent | CA | San Luis Obispo County | 115 kV | 100 MW | 5.7 yrs | 55.3 |
| UNKNOWN303684 | Substation-Adjacent | CA | Santa Barbara County | 115 kV | 100 MW | 5.7 yrs | 54.6 |
| SANTA YNEZ SWITCH | Substation-Adjacent | CA | Santa Barbara County | 115 kV | 100 MW | 5.7 yrs | 54.4 |
| SISQUOC | Substation-Adjacent | CA | Santa Barbara County | 115 kV | 100 MW | 5.8 yrs | 54.2 |
| MANVILLE | Substation-Adjacent | CA | Santa Barbara County | 115 kV | 100 MW | 5.7 yrs | 54.2 |
| ZACA | Substation-Adjacent | CA | Santa Barbara County | 115 kV | 100 MW | 5.7 yrs | 53.9 |
| DIVIDE | Substation-Adjacent | CA | Santa Barbara County | 115 kV | 100 MW | 5.7 yrs | 53.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for CABRILLO substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.