California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
115
kV

BANGOR is an electric transmission substation in California, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
Coordinates39.3876, -121.4031

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85406115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE8.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BANGOR, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BANGOR substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SUTTERSubstation-AdjacentCASutter County230 kV300 MW5.7 yrs59.7
O'BANIONSubstation-AdjacentCASutter County230 kV300 MW5.7 yrs58.8
Greenleaf 1BrownfieldCASutter66 MW58.7
Greenfield (TABLE MT. - VACA-DIXON)GreenfieldCASutter County500 kV1,000 MW5.7 yrs57.2
Greenfield (TESLA - TABLE MT.)GreenfieldCASutter County500 kV1,000 MW5.7 yrs57.2
Greenfield (TESLA - TABLE MT.)GreenfieldCASutter County500 kV1,000 MW5.7 yrs56.9
Greenfield (TABLE MT. - VACA-DIXON)GreenfieldCASutter County500 kV1,000 MW5.7 yrs56.7
TABLE MT.Substation-AdjacentCAButte County500 kV1,000 MW5.7 yrs56.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BANGOR substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.