AVE 58

Substation

California · IMPERIAL IRRIGATION DISTRICT

Max voltage
161
kV

AVE 58 is an electric transmission substation in California, operated by IMPERIAL IRRIGATION DISTRICT. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorIMPERIAL IRRIGATION DISTRICT
Coordinates33.6305, -116.2398

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#86168161 kVIMPERIAL IRRIGATION DISTRICTIN SERVICE80.6 mi
#87604161 kVIMPERIAL IRRIGATION DISTRICTIN SERVICE3.6 mi
#92421161 kVIMPERIAL IRRIGATION DISTRICTIN SERVICE80.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of AVE 58, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near AVE 58 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DEVERSSubstation-AdjacentCARiverside County500 kV1,000 MW5.7 yrs63.7
UNKNOWN307724Substation-AdjacentCARiverside County230 kV300 MW5.7 yrs57.0
Greenfield (RED BLUFF - DEVERS)GreenfieldCARiverside County500 kV1,000 MW5.7 yrs56.7
VENWINDSubstation-AdjacentCARiverside County230 kV300 MW5.7 yrs55.9
CONCHOSubstation-AdjacentCARiverside County115 kV100 MW5.7 yrs55.7
TAP305309Substation-AdjacentCARiverside County115 kV100 MW5.7 yrs55.5
Greenfield (RED BLUFF - DEVERS)GreenfieldCARiverside County500 kV1,000 MW5.7 yrs55.1
TAMARISKSubstation-AdjacentCARiverside County115 kV100 MW5.7 yrs55.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for AVE 58 substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.