TUNICA

Substation

Arkansas · ENTERGY MISSISSIPPI INC

Max voltage
230
kV

TUNICA is an electric transmission substation in Arkansas, operated by ENTERGY MISSISSIPPI INC. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorENTERGY MISSISSIPPI INC
Coordinates34.6333, -90.3998

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#19428230 kVIN SERVICE22.4 mi
#46068230 kVENTERGY MISSISSIPPI INCIN SERVICE16.0 mi
#28742115 kVENTERGY MISSISSIPPI INCIN SERVICE0.7 mi
#56525115 kVENTERGY MISSISSIPPI INCIN SERVICE16.7 mi
#56532115 kVENTERGY MISSISSIPPI INCIN SERVICE14.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TUNICA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TUNICA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FREEPORTSubstation-AdjacentMSDeSoto County500 kV1,000 MW1.4 yrs78.6
SOUTHAVENSubstation-AdjacentMSDeSoto County500 kV1,000 MW1.4 yrs75.9
HORN LAKESubstation-AdjacentMSDeSoto County230 kV300 MW1.4 yrs74.3
TWINKLETOWNSubstation-AdjacentMSDeSoto County230 kV300 MW1.4 yrs70.0
CHURCH ROADSubstation-AdjacentMSDeSoto County230 kV300 MW1.4 yrs70.0
Greenfield (WEST MEMPHIS SUBSTATION - KEO )GreenfieldARSt. Francis County500 kV1,000 MW1.4 yrs69.1
Greenfield (UNKNOWN115609 - FREEPORT)GreenfieldMSDeSoto County500 kV1,000 MW1.4 yrs69.1
Greenfield (WEST MEMPHIS SUBSTATION - KEO )GreenfieldARSt. Francis County500 kV1,000 MW1.4 yrs68.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen