Greenfield (UNKNOWN115609 - FREEPORT)

Greenfield

DeSoto County, Mississippi · MISO

DC Readiness
69.1
Good / 100

Greenfield (UNKNOWN115609 - FREEPORT) is a greenfield datacenter candidate site in DeSoto County, Mississippi, interconnecting through MISO. It screens at 69.1/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN115609
Substation voltage500 kV
Available capacity1,000 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPLevel(3) Memphis
IXP distance10.5 mi
Fiber providers6
Fiber coverage89.7%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance412.8 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY MISSISSIPPI INC
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score55/100
Construction cost index84.0 (avg 100)

Location context

Nearest datacenterxAI Macrohardrr
DC distance4.2 mi
Nearest rail1.9 mi
Nearest gas pipeline2.3 mi
Nearest fiber route151.8 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.81¢/kWh
Industrial electricity6.54¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,266

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
48
Fiber connectivity12%
90
Energy cost10%
89
Water risk8%
90
Natural hazard8%
55
Buildability7%
45
Labor market4%
50
DC cluster4%
80
Land / acreage3%
49
Construction cost3%
80
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in DeSoto County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN115609 - FREEPORT)
SiteTypeVoltageCapacityQueue waitScore
FREEPORTSubstation-Adjacent500 kV1,000 MW1.4 yrs78.6
SOUTHAVENSubstation-Adjacent500 kV1,000 MW1.4 yrs75.9
HORN LAKESubstation-Adjacent230 kV300 MW1.4 yrs74.3
Greenfield (FREEPORT - CORDOVA)Greenfield500 kV1,000 MW1.4 yrs72.5
GETWELLSubstation-Adjacent230 kV300 MW1.4 yrs72.0
UNKNOWN159894Substation-Adjacent161 kV100 MW1.4 yrs70.5
CHURCH ROADSubstation-Adjacent230 kV300 MW1.4 yrs70.0
MILLERSubstation-Adjacent161 kV100 MW1.4 yrs70.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN115609 - FREEPORT), DeSoto County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.