WINCHESTER

Substation

Arizona · SULPHUR SPRINGS VALLEY ELECTRIC COOPERATIVE

Max voltage
345
kV

WINCHESTER is an electric transmission substation in Arizona, operated by SULPHUR SPRINGS VALLEY ELECTRIC COOPERATIVE. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage230 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorSULPHUR SPRINGS VALLEY ELECTRIC COOPERATIVE
StateArizona
Coordinates32.1904, -110.2039

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82078345 kVIN SERVICE40.8 mi
#90580345 kVIN SERVICE87.8 mi
#85779230 kVSULPHUR SPRINGS VALLEY ELECTRIC COOPERATIVEIN SERVICE20.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WINCHESTER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WINCHESTER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
APACHESubstation-AdjacentAZCochise County230 kV300 MW5.7 yrs64.7
Greenfield (SPRINGERVILLE - VAIL)GreenfieldAZCochise County345 kV600 MW3.5 yrs62.0
WINCHESTERSubstation-AdjacentAZCochise County345 kV600 MW5.7 yrs61.2
BUTTERFIELDSubstation-AdjacentAZCochise County230 kV300 MW5.7 yrs61.1
Greenfield (SPRINGERVILLE - VAIL)GreenfieldAZSanta Cruz County345 kV600 MW3.5 yrs60.6
Greenfield (SPRINGERVILLE - VAIL)GreenfieldAZCochise County345 kV600 MW3.5 yrs60.3
Greenfield (SPRINGERVILLE - VAIL)GreenfieldAZCochise County345 kV600 MW3.5 yrs60.1
ADAMSSubstation-AdjacentAZCochise County115 kV100 MW5.7 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WINCHESTER substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.