TOPOCK

Substation

Arizona · MOHAVE ELECTRIC COOPERATIVE

Max voltage
230
kV

TOPOCK is an electric transmission substation in Arizona, operated by MOHAVE ELECTRIC COOPERATIVE. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines6

Ownership & operation

OperatorMOHAVE ELECTRIC COOPERATIVE
StateArizona
Coordinates34.9082, -114.4550

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82593230 kVMOHAVE ELECTRIC COOPERATIVEIN SERVICE6.3 mi
#82874230 kVMOHAVE ELECTRIC COOPERATIVEIN SERVICE6.3 mi
#82885230 kVIN SERVICE20.9 mi
#84155230 kVIN SERVICE38.7 mi
#84401230 kVIN SERVICE20.8 mi
#90168230 kVIN SERVICE26.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TOPOCK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TOPOCK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MOHAVESubstation-AdjacentAZMohave County500 kV1,000 MW5.7 yrs74.8
MohaveBrownfieldNVClark1,636 MW69.3
TAP318039Substation-AdjacentAZMohave County230 kV300 MW5.7 yrs64.1
SOUTH POINT ENERGY CENTERSubstation-AdjacentAZMohave County230 kV300 MW5.7 yrs63.8
TAP310930Substation-AdjacentAZMohave County230 kV300 MW5.7 yrs63.2
Greenfield (ELDORADO - None)GreenfieldAZMohave County500 kV1,000 MW5.7 yrs62.5
Greenfield (ELDORADO - None)GreenfieldAZMohave County500 kV1,000 MW5.7 yrs61.8
TAP318004Substation-AdjacentAZMohave County230 kV300 MW5.7 yrs61.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TOPOCK substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.