THREE POINTS

Substation

Arizona · TRICO ELECTRIC COOPERATIVE

Max voltage
115
kV

THREE POINTS is an electric transmission substation in Arizona, operated by TRICO ELECTRIC COOPERATIVE. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorTRICO ELECTRIC COOPERATIVE
StateArizona
Coordinates32.0945, -111.2856

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79462115 kVTRICO ELECTRIC COOPERATIVEIN SERVICE15.7 mi
#86547115 kVIN SERVICE19.3 mi
#89427115 kVIN SERVICE11.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of THREE POINTS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near THREE POINTS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SOUTHSubstation-AdjacentAZSanta Cruz County345 kV600 MW5.7 yrs67.3
TUCSONSubstation-AdjacentAZPima County138 kV100 MW5.7 yrs64.9
SANTA CRUZSubstation-AdjacentAZPima County138 kV100 MW5.7 yrs64.8
SAHUARITASubstation-AdjacentAZSanta Cruz County230 kV300 MW5.7 yrs64.8
RANCHO VISTOSOSubstation-AdjacentAZPinal County138 kV100 MW5.7 yrs62.8
BICKNELLSubstation-AdjacentAZSanta Cruz County345 kV600 MW5.7 yrs62.8
IRVINGTONSubstation-AdjacentAZSanta Cruz County138 kV100 MW5.7 yrs62.8
Greenfield (SOUTH - PINAL WEST)GreenfieldAZSanta Cruz County345 kV600 MW5.7 yrs62.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for THREE POINTS substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.