TAP302427 is an electric transmission substation in Arizona. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

StateArizona
Coordinates32.7812, -113.8846

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79528161 kVIN SERVICE29.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302427, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302427 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HOODOO WASHSubstation-AdjacentAZYuma County500 kV1,000 MW5.7 yrs64.2
Greenfield (HOODOO WASH - NORTH GILA)GreenfieldAZYuma County500 kV1,000 MW5.7 yrs61.8
Greenfield (HOODOO WASH - NORTH GILA)GreenfieldAZYuma County500 kV1,000 MW5.7 yrs61.2
Greenfield (HOODOO WASH - NORTH GILA)GreenfieldAZYuma County500 kV1,000 MW5.7 yrs59.7
Greenfield (HOODOO WASH - NORTH GILA)GreenfieldAZYuma County500 kV1,000 MW5.7 yrs59.1
Greenfield (HOODOO WASH - NORTH GILA)GreenfieldAZYuma County500 kV1,000 MW5.7 yrs58.5
TAP302427Substation-AdjacentAZYuma County161 kV100 MW5.7 yrs57.7
Greenfield (HOODOO WASH - NORTH GILA)GreenfieldAZYuma County500 kV1,000 MW5.7 yrs57.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP302427 substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.