SUGARLOAF

Substation

Arizona · ARIZONA PUBLIC SERVICE COMPANY

Max voltage
500
kV

SUGARLOAF is an electric transmission substation in Arizona, operated by ARIZONA PUBLIC SERVICE COMPANY. It is classified as extra-high-voltage (500 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines2

Ownership & operation

OperatorARIZONA PUBLIC SERVICE COMPANY
StateArizona
Coordinates34.6361, -110.1345

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82110500 kVARIZONA PUBLIC SERVICE COMPANYIN SERVICE24.0 mi
#91678500 kVIN SERVICE49.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SUGARLOAF, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SUGARLOAF substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHOLLASubstation-AdjacentAZNavajo County500 kV1,000 MW5.7 yrs68.4
SUGARLOAFSubstation-AdjacentAZNavajo County500 kV1,000 MW5.7 yrs66.5
UNKNOWN300020Substation-AdjacentAZNavajo County345 kV600 MW3.5 yrs64.7
Greenfield (FOUR CORNERS - UNKNOWN307401)GreenfieldAZNavajo County345 kV600 MW3.5 yrs59.9
Greenfield (SUGARLOAF - CHOLLA)GreenfieldAZNavajo County500 kV1,000 MW5.7 yrs59.0
Greenfield (SILVER KING - CORONADO)GreenfieldAZNavajo County500 kV1,000 MW5.7 yrs58.9
Greenfield (SILVER KING - CORONADO)GreenfieldAZNavajo County500 kV1,000 MW5.7 yrs57.9
Greenfield (PINAL CENTRAL - CHOLLA)GreenfieldAZNavajo County500 kV1,000 MW5.7 yrs57.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SUGARLOAF substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.