SPURLOCK

Substation

Arizona · SALT RIVER PROJECT

Max voltage
115
kV

SPURLOCK is an electric transmission substation in Arizona, operated by SALT RIVER PROJECT. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorSALT RIVER PROJECT
StateArizona
Coordinates33.3537, -111.4530

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84938115 kVIN SERVICE21.3 mi
#90723115 kVSALT RIVER PROJECTIN SERVICE3.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SPURLOCK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SPURLOCK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROWNINGSubstation-AdjacentAZPinal County500 kV1,000 MW5.7 yrs72.6
Copper Crossing Energy and Research CentBrownfieldAZPinal County230 kV1,779 MW5.7 yrs69.6
CORBELLSubstation-AdjacentAZMaricopa County230 kV300 MW5.7 yrs69.0
SCHRADERSubstation-AdjacentAZPinal County230 kV300 MW5.7 yrs68.8
ROGERSSubstation-AdjacentAZMaricopa County230 kV300 MW5.7 yrs68.6
Greenfield (BROWNING - KYRENE)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs68.3
THUNDERSTONESubstation-AdjacentAZPinal County230 kV300 MW5.7 yrs68.1
DINOSAURSubstation-AdjacentAZPinal County230 kV300 MW5.7 yrs67.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.