Skip to content
Gridcensus

SILVER KING

Substation

Arizona

Max voltage
500
kV

SILVER KING is an electric transmission substation in Arizona. It is classified as extra-high-voltage (500 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage115 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

StateArizona
Coordinates33.3392, -111.0374

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SILVER KING, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SILVER KING substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Pinal Coal AreaGreenfieldAZPinal5.7 yrs57.0
EC Pinal Coal AreaGreenfieldAZPinal5.7 yrs56.2
EC Pinal Coal AreaGreenfieldAZPinal5.7 yrs55.6
OZ PinalGreenfieldAZPinal5.7 yrs54.4
SILVER KINGSubstation-AdjacentAZGila County500 kV1,000 MW6.9 yrs54.2
OZ GilaGreenfieldAZGila5.7 yrs54.1
EC Pinal Coal AreaGreenfieldAZPinal5.7 yrs51.6
OZ GilaGreenfieldAZGila5.7 yrs51.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SILVER KING substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.