SILVER KING

Substation

Arizona

Max voltage
500
kV

SILVER KING is an electric transmission substation in Arizona. It is classified as extra-high-voltage (500 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage115 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

StateArizona
Coordinates33.3392, -111.0374

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85044500 kVIN SERVICE38.5 mi
#92676500 kVIN SERVICE180.5 mi
#82408230 kVIN SERVICE35.6 mi
#90836115 kVIN SERVICE6.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SILVER KING, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SILVER KING substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (BROWNING - SILVER KING)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs65.0
Greenfield (BROWNING - SILVER KING)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs63.4
SILVER KINGSubstation-AdjacentAZGila County500 kV1,000 MW5.7 yrs62.8
Greenfield (PINAL CENTRAL - CHOLLA)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs62.0
Greenfield (PINAL CENTRAL - CHOLLA)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs61.9
Greenfield (SAGUARO - CHOLLA)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs61.8
Greenfield (SAGUARO - CHOLLA)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs61.6
Greenfield (SILVER KING - CORONADO)GreenfieldAZGila County500 kV1,000 MW5.7 yrs61.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SILVER KING substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.