SAN RAFAEL

Substation

Arizona · SULPHUR SPRINGS VALLEY ELECTRIC COOPERATIVE

Max voltage
230
kV

SAN RAFAEL is an electric transmission substation in Arizona, operated by SULPHUR SPRINGS VALLEY ELECTRIC COOPERATIVE. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorSULPHUR SPRINGS VALLEY ELECTRIC COOPERATIVE
StateArizona
Coordinates31.5248, -110.2314

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#89275230 kVSULPHUR SPRINGS VALLEY ELECTRIC COOPERATIVEIN SERVICE37.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SAN RAFAEL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SAN RAFAEL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SAN RAFAELSubstation-AdjacentAZCochise County230 kV300 MW5.7 yrs62.4
FORT HUACHUCASubstation-AdjacentAZSanta Cruz County138 kV100 MW5.7 yrs59.9
MURALSubstation-AdjacentAZCochise County115 kV100 MW5.7 yrs58.4
Greenfield (BUTTERFIELD - SAN RAFAEL)GreenfieldAZCochise County230 kV300 MW5.7 yrs57.9
Greenfield (BUTTERFIELD - SAN RAFAEL)GreenfieldAZCochise County230 kV300 MW5.7 yrs57.6
UNKNOWN302780Substation-AdjacentAZCochise County115 kV100 MW5.7 yrs57.5
Greenfield (BUTTERFIELD - SAN RAFAEL)GreenfieldAZCochise County230 kV300 MW5.7 yrs57.0
KARTCHNERSubstation-AdjacentAZSanta Cruz County115 kV100 MW5.7 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SAN RAFAEL substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.