RUDD

Substation

Arizona · SALT RIVER PROJECT

Max voltage
500
kV

RUDD is an electric transmission substation in Arizona, operated by SALT RIVER PROJECT. It is classified as extra-high-voltage (500 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines8

Ownership & operation

OperatorSALT RIVER PROJECT
StateArizona
Coordinates33.4099, -112.3172

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#90690500 kVIN SERVICE35.5 mi
#81749230 kVIN SERVICE17.6 mi
#87387230 kVSALT RIVER PROJECTIN SERVICE8.4 mi
#88935230 kVSALT RIVER PROJECTIN SERVICE4.3 mi
#89848230 kVIN SERVICE11.1 mi
#91214230 kVSALT RIVER PROJECTIN SERVICE8.5 mi
#81242230 kVSALT RIVER PROJECTIN SERVICE4.2 mi
#91411230 kVIN SERVICE11.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RUDD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RUDD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WESTWINGSubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs72.6
PINNACLE PEAK APSSubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs72.4
KYRENESubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs70.6
RUDDSubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs70.5
JOJOBASubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs69.9
DUKESubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs68.9
ANDERSONSubstation-AdjacentAZMaricopa County230 kV300 MW5.7 yrs68.7
DEER VALLEYSubstation-AdjacentAZMaricopa County230 kV300 MW5.7 yrs68.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.