PEACOCK

Substation

Arizona

Max voltage
345
kV

PEACOCK is an electric transmission substation in Arizona. It is classified as high-voltage (345 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage230 kV
Voltage classHigh-voltage (345 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

StateArizona
Coordinates35.2508, -113.7179

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82596345 kVIN SERVICE87.7 mi
#88811345 kVIN SERVICE150.9 mi
#79867230 kVIN SERVICE29.9 mi
#82256230 kVIN SERVICE15.8 mi
#83216230 kVIN SERVICE22.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PEACOCK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PEACOCK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PEACOCKSubstation-AdjacentAZMohave County345 kV600 MW5.7 yrs66.1
TAP310930Substation-AdjacentAZMohave County230 kV300 MW5.7 yrs63.2
Greenfield (WESTWING - MEAD)GreenfieldAZMohave County500 kV1,000 MW5.7 yrs61.4
TAP318004Substation-AdjacentAZMohave County230 kV300 MW5.7 yrs61.4
ROUND VALLEYSubstation-AdjacentAZMohave County230 kV300 MW5.7 yrs61.4
Greenfield (WESTWING - MEAD)GreenfieldAZMohave County500 kV1,000 MW5.7 yrs61.1
TAP318006Substation-AdjacentAZMohave County230 kV300 MW5.7 yrs60.8
Greenfield (MOENKOPI - ELDORADO)GreenfieldAZMohave County500 kV1,000 MW5.7 yrs59.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PEACOCK substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.