ORACLE JUNCTION
SubstationArizona
ORACLE JUNCTION is an electric transmission substation in Arizona. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #81764 | 115 kV | — | IN SERVICE | 26.9 mi |
| #85250 | 115 kV | — | IN SERVICE | 2.0 mi |
| #90300 | 115 kV | — | IN SERVICE | 19.4 mi |
| #91489 | 115 kV | — | IN SERVICE | 38.7 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of ORACLE JUNCTION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SAGUARO | Substation-Adjacent | AZ | Pinal County | 500 kV | 1,000 MW | 5.7 yrs | 72.2 |
| TORTOLITA | Substation-Adjacent | AZ | Pinal County | 500 kV | 1,000 MW | 5.7 yrs | 70.2 |
| TUCSON | Substation-Adjacent | AZ | Pima County | 138 kV | 100 MW | 5.7 yrs | 64.9 |
| SANTA CRUZ | Substation-Adjacent | AZ | Pima County | 138 kV | 100 MW | 5.7 yrs | 64.8 |
| SNYDER | Substation-Adjacent | AZ | Pinal County | 138 kV | 100 MW | 5.7 yrs | 64.4 |
| RANCHO VISTOSO | Substation-Adjacent | AZ | Pinal County | 138 kV | 100 MW | 5.7 yrs | 62.8 |
| EAST LOOP | Substation-Adjacent | AZ | Santa Cruz County | 138 kV | 100 MW | 5.7 yrs | 62.6 |
| WEST INA | Substation-Adjacent | AZ | Pinal County | 138 kV | 100 MW | 5.7 yrs | 61.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for ORACLE JUNCTION substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.