NAVAJO

Substation

Arizona · NAVAJO TRIBAL UTILITY AUTHORITY

Max voltage
500
kV

NAVAJO is an electric transmission substation in Arizona, operated by NAVAJO TRIBAL UTILITY AUTHORITY. It is classified as extra-high-voltage (500 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines5

Ownership & operation

OperatorNAVAJO TRIBAL UTILITY AUTHORITY
StateArizona
Coordinates36.9026, -111.3947

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83884500 kVNAVAJO TRIBAL UTILITY AUTHORITYIN SERVICE76.3 mi
#84400500 kVIN SERVICE223.3 mi
#86807500 kVIN SERVICE204.0 mi
#84587230 kVIN SERVICE7.5 mi
#91594230 kVNAVAJO TRIBAL UTILITY AUTHORITYIN SERVICE56.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NAVAJO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NAVAJO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NAVAJOSubstation-AdjacentUTKane County500 kV1,000 MW5.7 yrs71.1
GLEN CANYONSubstation-AdjacentUTKane County345 kV600 MW5.7 yrs63.9
Greenfield (NAVAJO - DUGAS)GreenfieldUTKane County500 kV1,000 MW5.7 yrs62.3
Greenfield (NAVAJO - DUGAS)GreenfieldUTKane County500 kV1,000 MW5.7 yrs60.8
Greenfield (MOENKOPI - NAVAJO)GreenfieldUTKane County500 kV1,000 MW5.7 yrs60.8
Greenfield (MOENKOPI - NAVAJO)GreenfieldUTKane County500 kV1,000 MW5.7 yrs60.5
Greenfield (MOENKOPI - NAVAJO)GreenfieldUTKane County500 kV1,000 MW5.7 yrs59.2
Greenfield (NAVAJO - CRYSTAL)GreenfieldUTKane County500 kV1,000 MW5.7 yrs59.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NAVAJO substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.