MORENCI

Substation

Arizona · DUCAN VALLEY ELECTRIC COOPERATIVE

Max voltage
230
kV

MORENCI is an electric transmission substation in Arizona, operated by DUCAN VALLEY ELECTRIC COOPERATIVE. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorDUCAN VALLEY ELECTRIC COOPERATIVE
StateArizona
Coordinates32.9885, -109.2751

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83322230 kVDUCAN VALLEY ELECTRIC COOPERATIVEIN SERVICE6.4 mi
#92551230 kVIN SERVICE27.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MORENCI, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MORENCI substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GREENLEESubstation-AdjacentAZGreenlee County345 kV600 MW3.5 yrs64.9
MORENCISubstation-AdjacentAZGreenlee County230 kV300 MW5.7 yrs62.0
DOS CONDADOSSubstation-AdjacentAZGraham County230 kV300 MW5.7 yrs60.8
Greenfield (SPRINGERVILLE - VAIL)GreenfieldAZGraham County345 kV600 MW3.5 yrs60.2
HACKBERRYSubstation-AdjacentAZGraham County230 kV300 MW5.7 yrs60.1
Greenfield (SPRINGERVILLE - VAIL)GreenfieldAZGraham County345 kV600 MW3.5 yrs60.0
Greenfield (SPRINGERVILLE - VAIL)GreenfieldAZGreenlee County345 kV600 MW3.5 yrs59.3
Greenfield (SPRINGERVILLE - VAIL)GreenfieldAZGreenlee County345 kV600 MW3.5 yrs58.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MORENCI substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.