MOHAVE

Substation

Arizona · NEVADA POWER COMPANY

Max voltage
500
kV

MOHAVE is an electric transmission substation in Arizona, operated by NEVADA POWER COMPANY. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

OperatorNEVADA POWER COMPANY
StateArizona
Coordinates35.1475, -114.5953

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#88170500 kVIN SERVICE175.6 mi
#92198500 kVNEVADA POWER COMPANYIN SERVICE0.2 mi
#80512230 kVIN SERVICE1.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MOHAVE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MOHAVE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MOHAVESubstation-AdjacentAZMohave County500 kV1,000 MW5.7 yrs74.8
MohaveBrownfieldNVClark1,636 MW69.3
TAP318039Substation-AdjacentAZMohave County230 kV300 MW5.7 yrs64.1
SOUTH POINT ENERGY CENTERSubstation-AdjacentAZMohave County230 kV300 MW5.7 yrs63.8
Greenfield (ELDORADO - None)GreenfieldAZMohave County500 kV1,000 MW5.7 yrs62.5
TAP318000Substation-AdjacentAZMohave County230 kV300 MW5.7 yrs62.4
Greenfield (ELDORADO - None)GreenfieldAZMohave County500 kV1,000 MW5.7 yrs61.8
Greenfield (ELDORADO - None)GreenfieldNVClark County500 kV1,000 MW5.7 yrs61.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MOHAVE substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.