MIAMI

Substation

Arizona

Max voltage
115
kV

MIAMI is an electric transmission substation in Arizona. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateArizona
Coordinates33.3997, -110.8674

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81850115 kVIN SERVICE8.1 mi
#90165115 kVIN SERVICE9.5 mi
#92447115 kVIN SERVICE3.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MIAMI, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MIAMI substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (BROWNING - SILVER KING)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs63.4
SILVER KINGSubstation-AdjacentAZGila County500 kV1,000 MW5.7 yrs62.8
Greenfield (PINAL CENTRAL - CHOLLA)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs61.9
Greenfield (SAGUARO - CHOLLA)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs61.8
Greenfield (SAGUARO - CHOLLA)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs61.6
Greenfield (SILVER KING - CORONADO)GreenfieldAZGila County500 kV1,000 MW5.7 yrs61.2
Greenfield (PINAL CENTRAL - CHOLLA)GreenfieldAZPinal County500 kV1,000 MW5.7 yrs61.1
HAYDENSubstation-AdjacentAZPinal County115 kV100 MW5.7 yrs60.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MIAMI substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.