EL CENTRO

Substation

Arizona · IMPERIAL IRRIGATION DISTRICT

Max voltage
161
kV

EL CENTRO is an electric transmission substation in Arizona, operated by IMPERIAL IRRIGATION DISTRICT. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorIMPERIAL IRRIGATION DISTRICT
StateArizona
Coordinates32.8017, -115.5375

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#88545161 kVIMPERIAL IRRIGATION DISTRICTIN SERVICE56.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EL CENTRO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EL CENTRO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
IMPERIAL VALLEYSubstation-AdjacentCAImperial County500 kV1,000 MW5.7 yrs58.4
MIDWAYSubstation-AdjacentCAImperial County230 kV300 MW5.7 yrs56.3
EL CENTROSubstation-AdjacentCAImperial County230 kV300 MW5.7 yrs56.1
Greenfield (NORTH GILA - IMPERIAL VALLEY)GreenfieldCAImperial County500 kV1,000 MW5.7 yrs55.3
Greenfield (NORTH GILA - IMPERIAL VALLEY)GreenfieldCAImperial County500 kV1,000 MW5.7 yrs55.2
Greenfield (SUNCREST - IMPERIAL VALLEY)GreenfieldCAImperial County500 kV1,000 MW5.7 yrs54.8
Greenfield (NORTH GILA - IMPERIAL VALLEY)GreenfieldCAImperial County500 kV1,000 MW5.7 yrs54.2
UNKNOWN308676Substation-AdjacentCAImperial County230 kV300 MW5.7 yrs53.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EL CENTRO substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.