DEER VALLEY

Substation

Arizona · ARIZONA PUBLIC SERVICE COMPANY

Max voltage
230
kV

DEER VALLEY is an electric transmission substation in Arizona, operated by ARIZONA PUBLIC SERVICE COMPANY. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorARIZONA PUBLIC SERVICE COMPANY
StateArizona
Coordinates33.6631, -112.1335

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83252230 kVARIZONA PUBLIC SERVICE COMPANYIN SERVICE14.0 mi
#88148230 kVARIZONA PUBLIC SERVICE COMPANYIN SERVICE14.6 mi
#90666230 kVIN SERVICE8.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DEER VALLEY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DEER VALLEY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WESTWINGSubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs72.6
MORGANSubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs72.5
PINNACLE PEAK APSSubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs72.4
KYRENESubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs70.6
RUDDSubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs70.5
CORBELLSubstation-AdjacentAZMaricopa County230 kV300 MW5.7 yrs69.0
ANDERSONSubstation-AdjacentAZMaricopa County230 kV300 MW5.7 yrs68.7
WARDSubstation-AdjacentAZMaricopa County230 kV300 MW5.7 yrs68.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DEER VALLEY substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.