BUCK

Substation

Arizona · AZUSA LIGHT & POWER

Max voltage
230
kV

BUCK is an electric transmission substation in Arizona, operated by AZUSA LIGHT & POWER. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage161 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorAZUSA LIGHT & POWER
StateArizona
Coordinates33.6161, -114.6846

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#90054230 kVIN SERVICE66.5 mi
#91307230 kVAZUSA LIGHT & POWER0.1 mi
#87107161 kVAZUSA LIGHT & POWERIN SERVICE63.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BUCK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BUCK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLORADO RIVERSubstation-AdjacentAZLa Paz County500 kV1,000 MW5.7 yrs64.4
Greenfield (COLORADO RIVER - UNKNOWN305616)GreenfieldAZLa Paz County500 kV1,000 MW5.7 yrs58.3
BLYTHE ENERGY INCSubstation-AdjacentAZLa Paz County230 kV300 MW5.7 yrs58.1
Greenfield (COLORADO RIVER - UNKNOWN305616)GreenfieldAZLa Paz County500 kV1,000 MW5.7 yrs57.1
BLYTHESubstation-AdjacentAZLa Paz County161 kV100 MW5.7 yrs56.4
Greenfield (COLORADO RIVER - UNKNOWN305616)GreenfieldAZLa Paz County500 kV1,000 MW5.7 yrs56.1
Greenfield (COLORADO RIVER - UNKNOWN305616)GreenfieldAZLa Paz County500 kV1,000 MW5.7 yrs55.5
Greenfield (BUCK - JULIAN HINDS)GreenfieldAZLa Paz County230 kV300 MW5.7 yrs51.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.