BRAWLEY

Substation

Arizona · TRICO ELECTRIC COOPERATIVE

Max voltage
115
kV

BRAWLEY is an electric transmission substation in Arizona, operated by TRICO ELECTRIC COOPERATIVE. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorTRICO ELECTRIC COOPERATIVE
StateArizona
Coordinates32.2533, -111.2287

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83211115 kVTRICO ELECTRIC COOPERATIVEIN SERVICE9.4 mi
#84442115 kVTRICO ELECTRIC COOPERATIVEIN SERVICE4.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BRAWLEY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BRAWLEY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SAGUAROSubstation-AdjacentAZPinal County500 kV1,000 MW5.7 yrs72.2
TORTOLITASubstation-AdjacentAZPinal County500 kV1,000 MW5.7 yrs70.2
SOUTHSubstation-AdjacentAZSanta Cruz County345 kV600 MW5.7 yrs67.3
TUCSONSubstation-AdjacentAZPima County138 kV100 MW5.7 yrs64.9
SAHUARITASubstation-AdjacentAZSanta Cruz County230 kV300 MW5.7 yrs64.8
SANTA CRUZSubstation-AdjacentAZPima County138 kV100 MW5.7 yrs64.8
SNYDERSubstation-AdjacentAZPinal County138 kV100 MW5.7 yrs64.4
Tucson International Airport AreaBrownfieldAZPima3 MW62.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen