AGUA FRIA

Substation

Arizona · SALT RIVER PROJECT

Max voltage
230
kV

AGUA FRIA is an electric transmission substation in Arizona, operated by SALT RIVER PROJECT. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorSALT RIVER PROJECT
StateArizona
Coordinates33.5570, -112.2187

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82123230 kVIN SERVICE5.7 mi
#87638230 kVSALT RIVER PROJECTIN SERVICE2.8 mi
#87717230 kVIN SERVICE11.4 mi
#88567230 kVIN SERVICE17.4 mi
#92718230 kVIN SERVICE9.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of AGUA FRIA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near AGUA FRIA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WESTWINGSubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs72.6
MORGANSubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs72.5
PINNACLE PEAK APSSubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs72.4
KYRENESubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs70.6
RUDDSubstation-AdjacentAZMaricopa County500 kV1,000 MW5.7 yrs70.5
CORBELLSubstation-AdjacentAZMaricopa County230 kV300 MW5.7 yrs69.0
SCHRADERSubstation-AdjacentAZPinal County230 kV300 MW5.7 yrs68.8
ANDERSONSubstation-AdjacentAZMaricopa County230 kV300 MW5.7 yrs68.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for AGUA FRIA substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.