TAP172027

Substation

Alaska · CHUGACH ELECTRIC ASSN INC

Max voltage
138
kV

TAP172027 is an electric transmission substation in Alaska, operated by CHUGACH ELECTRIC ASSN INC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorCHUGACH ELECTRIC ASSN INC
StateAlaska
Coordinates61.1458, -149.8226

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#61370138 kVIN SERVICE3.0 mi
#61381138 kVCHUGACH ELECTRIC ASSN INCIN SERVICE1.1 mi
#61382138 kVCHUGACH ELECTRIC ASSN INCIN SERVICE4.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP172027, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP172027 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
InternationalBrownfieldAKAnchorage Municipality46 MW67.4
TAP158536Substation-AdjacentAKAnchorage Municipality230 kV300 MW3.5 yrs65.6
RISER158537Substation-AdjacentAKAnchorage Municipality230 kV300 MW3.5 yrs65.5
UNIVERSITYSubstation-AdjacentAKAnchorage Municipality230 kV300 MW3.5 yrs65.4
PT. MACKENZIESubstation-AdjacentAKAnchorage Municipality230 kV300 MW3.5 yrs65.1
RISER158451Substation-AdjacentAKAnchorage Municipality230 kV300 MW3.5 yrs64.5
ANCHORAGE 1Substation-AdjacentAKAnchorage Municipality115 kV100 MW3.5 yrs62.6
UNKNOWN158561Substation-AdjacentAKAnchorage Municipality138 kV100 MW3.5 yrs62.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.