T5 Charlotte Campus
DatacenteractiveKings Mountain, NC
T5 Charlotte Campus is an operating datacenter facility in Kings Mountain, NC.. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Location
Nearby internet exchanges
- Digital Realty CLT (113 N Myers St)Charlotte, NC · 13 networks
- CENTRA CLT01 - Charlotte NC (701 E Trade)Charlotte, NC · 8 networks
- CLT2Charlotte, NC · 7 networks
- Digital Realty CLT (125 N Myers St)Charlotte, NC · 6 networks
- Flexential - Charlotte/South (CLT1/2/3)Charlotte, NC · 4 networks
Other datacenters nearby
- Apple - Maiden Data CenterNC
- Facebook Forest City Data CenterMeta · NC
- Datacenter 00116005354NC
- T5 Charlotte CampusT5 Data Centers · Kings Mountain, NC
- Meta Forest City datacenterMeta · NC
Nearby datacenter candidate sites
Scored candidate sites near T5 Charlotte Campus, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN111199 | Substation-Adjacent | NC | Cleveland County | 500 kV | 1,000 MW | 3.7 yrs | 79.9 |
| JAMES E. ROGERS ENERGY COMPLEX | Substation-Adjacent | NC | Cleveland County | 500 kV | 1,000 MW | 3.7 yrs | 77.6 |
| PACOLET TIE | Substation-Adjacent | SC | Cherokee County | 230 kV | 300 MW | 3.7 yrs | 74.7 |
| CLEVELAND CNTY GENERATING FACILITY | Substation-Adjacent | SC | Cherokee County | 230 kV | 300 MW | 4.3 yrs | 74.3 |
| SHELBY TIE | Substation-Adjacent | NC | Cleveland County | 230 kV | 300 MW | 3.7 yrs | 73.9 |
| Greenfield (UNKNOWN111199 - MCGUIRE) | Greenfield | NC | Gaston County | 500 kV | 1,000 MW | 3.7 yrs | 73.5 |
| Greenfield (UNKNOWN111199 - MCGUIRE) | Greenfield | NC | Gaston County | 500 kV | 1,000 MW | 3.7 yrs | 73.0 |
| James E. Rogers Energy Complex | Brownfield | NC | Rutherford | — | 1,010 MW | — | 71.9 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for T5 Charlotte Campus, Kings Mountain, NC. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.