CEDARBURG SOUTH

Substation-Adjacent

Washington, Wisconsin · MISO

DC Readiness
70.4
Excellent / 100

CEDARBURG SOUTH is a substation-adjacent datacenter candidate site in Washington, Wisconsin, interconnecting through MISO. It screens at 70.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCEDARBURG SOUTH
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth41
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEthoplex Data Center
IXP distance8.8 mi
Fiber providers7
Fiber coverage27.5%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance98.2 mi

Site characteristics

Parcel ownerCedarburg Light And Water Utility Commission
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund sitePIONEER CONTAINER CORP
Hazard sub-score68/100
Construction cost index87.8 (avg 100)

Location context

Nearest datacenterEthoplex Data Center
DC distance8.8 mi
Nearest rail0.7 mi
Nearest gas pipeline8.6 mi
Nearest fiber route65.0 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.21¢/kWh
Industrial electricity9.16¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$9,471

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
47
Fiber connectivity12%
75
Energy cost10%
85
Water risk8%
93
Natural hazard8%
68
Buildability7%
100
Labor market4%
50
DC cluster4%
85
Land / acreage3%
40
Construction cost3%
77
Gas pipeline2%
72
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Washington, ranked by DC Readiness.

Sites near CEDARBURG SOUTH
SiteTypeVoltageCapacityQueue waitScore
Greenfield (TAP138061 - GRANVILLE)Greenfield345 kV600 MW1.4 yrs70.4
TAP138062Substation-Adjacent345 kV600 MW1.4 yrs69.1
MEQUONSubstation-Adjacent138 kV100 MW1.4 yrs68.7
Greenfield (TAP138061 - GRANVILLE)Greenfield345 kV600 MW1.4 yrs68.6
Greenfield (TAP138061 - SHEBOYGAN FALLS ST)Greenfield345 kV600 MW1.4 yrs67.3
Greenfield (TAP138062 - CYPRESS)Greenfield345 kV600 MW1.4 yrs66.6
EC Near Omega Hills Gas RecoveryGreenfield1.4 yrs66.4
Greenfield (ARCADIAN - TAP138062)Greenfield345 kV600 MW1.4 yrs65.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CEDARBURG SOUTH, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.